Thank you for the complements.
Luxen: Indeed, the ink runs. I was disappointed at the way the pen flowed (Sharpie oil-based), and it was pretty uncontrollable, especially when writing backwards. And sadly no, I don't have any tiny stencils, though that'd be great!
16aroth6: Yeah, if only I could get them lasered next time, I think that would work well.
willwac: Oh, let's plug in the algorithm!
cost of calculator ($8, a decent deal) + cost of materials(Largely gifts, honestly, maybe $8 ) + $5*days building time (Thats hard to calculate, see paper below. Round it to 32 hours, say I worked 4 8 hour days, which would be ludicrously hard

, but $20) + $30 tools + shipping (likely about $8 ) = $74. o.O

o.O
So, I kept a meticulous log of all the time I put into working on it. Here is a picture.
I started breaking down in my care towards the end, but I would say it is a minimum amount of work put in, at least. How many days from beginning to end? Well, probably about 8 months! As with many projects, there were many holes in my working on it; many long breaks. So from the day I started to the day I ended (that could be calculated fairly accurately from my Cemetech posts) doesn't really count, but I'm glad I kept a log.
I'll probably be auctioning it, if someone was actually willing to pay around $75 for it.